Pool construction

Pool construction
In order to build a swimming pool, you can use several ways. There are inflatable structures, they are mounted in a couple of days, but they are not durable. There are fiberglass bowls, they are installed in a dug pit. The most convenient is the pool, built with your own hands. If you adhere to all the technologies and requirements, it will last a long time.
Having decided on a place for construction, you need to pay attention to the occurrence of groundwater. It is not recommended to build a stationary pool near the foundations of other buildings. When the form is selected, you can start making the project. Strictly according to the project, they begin to dig a pit. For the construction of a water drain, it is necessary to make a slope at the bottom towards the drainage pit. The bottom is covered with sand, and then rammed. Gravel is poured on top of it, 0.10 cm thick and also rammed.
Before pouring the bottom with concrete, install all the necessary communications. Cement grade 400 is used for concrete mortar. The thickness of the mixture layer is not less than 0.05 cm. The bottom is covered with a reinforcing mesh, which is also poured with concrete. After the concrete mixture dries, they proceed to the construction of the formwork for the walls. Boards are used for its manufacture.
The bottom must be moistened with water (for good coupling) and pour the first, fifteen-centimeter, layer of concrete. A reinforcing mesh is inserted into it. It will take about four days to make the walls, since their filling is layered. After the walls dry, the formwork is removed, they are plastered, cold seams are waterproofing. The curb is made of brick. All this must be tiled using glue, with high water-resistant effects. The seams are treated with a waterproof grout. After the work is done, the necessary equipment is installed and water is connected. fz-5.com